Building Up - Floor screed
001 - 25mm extra insulation above yellow radon membrane:

002 - Main 150mm insulation:

003 - Insulation & membrane installed - levelling spiders in place:

004 - Pour complete:

005 - Pour complete 2:

006 - Getting the levels right:

007 - Levelling spiders in doing their job:

008 - Removing air bubbles:

009 - All finished: